Laserfiche WebLink
<br />....6 <br />J <br /> <br />TUESDAY, JUNE 23~ 1987 <br /> <br />Street Underpass (of the Southern Railroad crossing) necessary to provide adequate <br /> <br />clearance for truck traffic using Liberty Street, including increased truck traffic <br /> <br />to be generated by the proposed Tultex Corporation's distribution center to be <br /> <br />constructed on State Route 108 (north of the City), going to and from Tultex <br /> <br />Corporation's manufacturing center on Franklin Street. The cost of this project was <br /> <br />estimated by City Manager Brown at between $200,000.00 and $300,000.00, 5% of which <br /> <br />would be borne by the City, with the remaining State cost of 95% to be charged <br /> <br />against the State's allocation to Martinsvi1le for future highway projects; however, <br /> <br />Mr. Brown pointed out, this would not affect the status of currently-approved <br /> <br />highway projects within the City. The adopted resolution follows: <br /> <br />WHEREAS, Tultex Corporation is proposing to expand its industrial facili- <br />ties through the construction of a distribution center in Henry County <br />abutting State Route 108 near the North Corporate Limits of the City; and <br /> <br />WHEREAS, the proposed Tultex Corporation expansion is extremely important <br />to the economic development and growth of Martinsville and Henry County, as <br />well as to the State of Virginia; and <br /> <br />WHEREAS, certain street and highway improvements situated both in Martins- <br />ville apd Henry County are needed to meet transportation needs resulting <br />from the proposed Tultex Corporation expansion; and <br /> <br />WHEREAS, Liberty Street (Route 108) is a vital transportation route between <br />the Tultex Corporation situated in Martinsville and the proposed <br />distribution center; and <br /> <br />WHEREAS, the Liberty Street (Route 108) Underpass of the Southern Railroad <br />has a low verticle clearance (12' 10") which is not sufficient to permit <br />truck traffic that will provide service to Tultex Corporation to move <br />through this underpass; and <br /> <br />WHEREAS, in accordance with Virginia Department of Transportation <br />construction allocation procedures, it is necessary that a request by <br />Council resolution be made in order that the Department program an urban <br />highway project in the City of Martinsville; now, therefore, <br /> <br />BE IT RESOLVED that the Council of the City of Martinsville, Virginia, in <br />regular session assembled, requests the Virginia Department of Transporta- <br />tion to establish an urban system highway project designed to improve the <br />vertical clearance of the Liberty Street Underpass of the Southern Railroad <br />crossing Liberty Street 0.10 miles south of Clearview Drive. The project <br />to consist of elevating the grade of the railroad structure and the <br />approach track as necessary to provide adequate clearance for truck traffic <br />using Liberty Street. This project being designated a Transportation <br />System Management (T.S.M.) project as shown on the 1985 Martinsville <br />Transportation Study. <br />