Laserfiche WebLink
MARKET STREET LOCATION <br /> <br />MAY, JUNE, JULY <br />2002 <br /> <br />A. Materials Collected: <br /> <br />1. Aluminum <br />2. Bi-metal Cans <br />3. Newspaper <br />4. Plastic <br />5. Glass <br /> <br />429 lbs. <br />798 lbs. <br />30,540 lbs. <br />2,640 lbs. <br />7,980 lbs. <br /> <br />TOTAL: 42,387 <br /> (21.19 Tons) <br /> <br />B. Total Cost of Drop-off Sire Operation <br /> <br />1. Rental of Containers: <br /> a. May <br /> b. June <br /> c. July <br /> <br />= $240.00 <br />= $240.00 <br />= $240.00 <br /> <br />$720.00 <br /> <br />2. Haul/Transport Fee: <br /> a. May <br /> b. June <br /> c. July <br /> <br />TOTAL: <br /> <br />= $627.95 <br />= $402.00 <br />= $274.00 <br /> $1,303.95 <br /> <br />$2,023.95 <br /> <br />Value of Materials Collected: <br /> <br />1. Aluminum Cans <br />2. Bi-metal <br />3. Newspaper <br />4. Plastic <br />5. Glass <br /> TOTAL: <br /> <br />= ($128.70) <br />= 0 <br />= 0 <br />= 0 <br />= 0 <br /> <br />($128.70) <br /> <br />TOTAL: <br /> <br /> $1,895.25 <br />(COST/TON = $89.44) <br /> <br /> <br />