My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 12/10/1998
City-of-Martinsville
>
City Council
>
Minutes
>
1998
>
Minutes 12/10/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2000 10:00:29 PM
Creation date
3/12/1999 6:08:22 PM
Metadata
Fields
Template:
City Council
Meeting Date
12/10/1998
City Council - Category
Minutes
City Council - Type
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THURSDAY, DECEMBER 10, 1998 <br /> <br />Council next heard a presentation from loyce Engineering representatives on a conceptual plan for <br /> <br />constructing and operating a waste transfer and recycling facility in the event of closure of the City' s landfill, <br />Elements of such a facility that were discussed included a transfer and materials recovery facility, a <br />tomposting facility, and a construction and demolition debris landfill, all to be operated on the site of the <br />current landfill. Mr. Reynolds stated that loyce had considered a number of scenarios for future waste <br />disposal, but that a waste transfer station continued to hold the most promise as the most cost effective <br />measure, Mr. Jeff Joyce, the City' s Landfill Superintendent, stated that staff had reviewed and visited a <br />number of transfer facilities, and had come to believe that this would be a viable and flexible alternative to <br />operating a landfill, although it would be more expensive. Consequently,.' he stated, it would be essential to <br />reduce the total amount of waste to be shipped, to perhaps one-third ofthe'amount landfilled. in currein,;,, <br />operations. Mayor Crabtree stated his belief that the City was within a foreseeable time of closure of the <br />landfill, and that an alternative must be found soon. Council Member Roop asked what the expected life of <br />the current facility might be, and was told by Ms. McHargue that the facility might be able to continue <br />operations through 2006. Mr. Leon Towarnicki, Director of Public Works, stated that as an analogy, if filling <br />the landfill were a golf game the City would be on about the fifteenth hole at this time. He stated that the next <br />budget for the facility should include consideration for changes in operations. Mr. Towarnicki also stated his <br />belief that there might be fifteen to twenty more years of operational life left in the construction/demolition <br />landfill if that capacity were managed and protected. Vice-Mayor Teague asked if rail transport of waste had <br />been considered as an alternative to trucking waste from a transfer station. He was advised that tracking was <br />less expensive and that few landfills take rail-transported waste. Mr. Reynolds pointed out that trucking also <br />provided more flexibility for hauling to the least expensive disposal site as market changes occurred. Mayor <br />Crabtree restated the need to move ahead with a plan for a transfer facility, especially since the City' s current <br />landfill site would already be acceptable to the community for such an operation. Vice-Mayor Teague then <br />stated his belief that the coming year's budget should include funds for the remediation activities of purchase <br />of land adjacent to the landfill and installation of bleed-down piping, as recommended by Joyce, as well as a <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.