My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 01/11/1955
City-of-Martinsville
>
City Council
>
Minutes
>
1955
>
Minutes 01/11/1955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2007 3:04:56 PM
Creation date
3/13/2007 9:44:04 AM
Metadata
Fields
Template:
City Council
Meeting Date
1/11/1955
City Council - Category
Minutes
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~6 <br /> <br />JANUlillY II, 1955 <br /> <br />TUESDAY <br /> <br />Reporting on the progress relating to the testing and future acceptance of the raw <br /> <br />water supply main constructed for the City by:M. J. Bles Construction Company, City <br /> <br />Mareger Mathewson reviewed with Council a statement or letter written and signed by <br /> <br />1~. M. J. Bles on behalf of his firm, as follows: <br /> <br />M. J. BillS CON:iTRUCTION C01-'PANY <br />McLean, Virginia <br /> <br />January 7, 1955 <br /> <br />Mr. Kent Mathewson <br />City Manager <br />City of Martinsville, Virginia <br /> <br />Re: Raw Vlater Supply Main <br />City of Martiroville, Virginia <br /> <br />Dear Mr. Mathewson: <br /> <br />This will confirm our conference of this date when the following persons were <br />present: (M. J. Bles) the writer of this letter; our Attorney, 1~. J. C. Wood; <br />our Superintendent, Mr. J. C. Jones; you as City Manager; your City Attorney, <br />Mr. W. F. Stone; your Director, Water and street Division, Mr. George Brmm; and <br />your Director of Viater, Electric and street Department, :Mr. Walker H. Graves; and <br />Mr. W. M. Johnson, Representative of Wiley and Wilson, your Consulting Engineering <br />F:irm. <br /> <br />We are opening this date the valves on the raw vrater pipe line covered by our <br />contract to deliver water to the City of Martins,rille filter plant from the <br />impounding reservoir on Beaver Creek constructed under a contract between my <br />Company and the City of Martinsville. This water vrill be delivered to the City <br />of Martinsville filter plant through the said pipe line as a means of testing <br />this pipe line until some fui:llre date when it is feasible to test this pipe line <br />under pressure and in accordance with the specifications, and after the line has <br />been subjected to operating pressure for a period of time, to assist in stabilizing <br />the joint compound in the pipe line. <br /> <br />At some future date to be determined we will then take this line out of service, <br />test this pipe line in accordance with the specifications and Ylotify the officials <br />of the City of M.artinsville, your Consulting Engineer and representatives of the <br />Lynchburg Foundry Company, which Company furnished the pipe for this line, and <br />after such due notice to said parties vre will then test this pipe line in the <br />presence of the parties stated above until this line meets the specifications. <br /> <br />In conducting this method of test and operation of the pipe line under normal <br />operating conditions we assume all responsibility for damage arising from the use <br />of the section of the pipe line covered by our contract and agree that all <br />provisions of the specifications and bond continue in full force until the pipe <br />line is tested and accepted by your Consulting I~ngineers as complying with the <br />requirements of the specifications. We further agree that when the pipe line is <br />
The URL can be used to link to this page
Your browser does not support the video tag.