Laserfiche WebLink
<br />proportion increasing from $7,870.00 to $12,866.52. <br /> <br />17. Provides for employment of a draftsman to further build <br /> <br />the Engineering Department. The demands and needs for engineering <br /> <br />surveys is becoming a growing problem to the City. It is necessary to <br /> <br />hold much planning in abeyance due to engineering limitations. The pro- <br /> <br />posed draftsman will not fully answer the situation but will be of help. <br /> <br />18. Frovides $7,000.00 for acquisition and development of <br /> <br />a new sanitary land fill site. Fractical use of the present site at the city <br /> <br />shops is expiring. and only a few more months remain in which a satis- <br /> <br />factory land fill operation can be conducted at that area. <br /> <br />19. Provides for surfacing pres ently not paved and for re- <br /> <br />surfacing existing surfaced streets at a net cost to the city of $52,028.69 <br /> <br />according to the following listed program. <br /> <br /> FLANT MIX SURFACING <br />Name From To Length <br /> -- <br />Wilson Street Memorial Boulevard Starling Avenue 1 , 1 30 <br />Memorial Boulevard 2001 South Underpass B ridge Street 2.137 <br />Brown Street Starling Avenue B road Street 2,138 <br />B road Street Church Street N & W RR 2,150 <br />Dunlap Street Fayette Street Church Street 826 <br />Spencer Street Fa yette Street Church Street 667 <br />Figsboro Road Clearview Drive City Limits 3,600 <br /> Total 12,648 <br /> - 10 - <br />