Laserfiche WebLink
<br />33. Provides $20,453.60 to continue the water meter testing program. This <br /> <br />year should complete the major repairs and initial survey of all meters. <br /> <br />Next year, 1960-61, the department can cut back and go to a regular <br /> <br />schedule of a 5-year check on each meter. <br /> <br />34. Provides $6,000 which, together with $5,000 encumbered from the current <br /> <br />year, will make $11,000 available for relocating and lowering water <br /> <br />mains for the rebuilding of Church Street and Chatham Road to Bob Gregory <br /> <br />Street. $2,500 is assigned in the sewer accounts for like purpose on the <br /> <br />sewer lines. <br /> <br />35. Provides $1,500, reduced from $8,000, necessary for new water line <br /> <br />construction on Route 58, Danville Road, in anticipation of highway <br /> <br />construction beyond Bob Gregory Street. <br /> <br />36. Provides $18,096.20 for materials for water line construction projects <br /> <br />according to the following listing. Here again close comparisons are <br /> <br />being maintained between city installation costs and costs of contract work <br /> <br />with the prevailing opinion being that the city is currently netting cost- <br /> <br />wis e just as good as, if not sl ightl y better than, contract prices. <br /> <br />WATER LINE CONSTRUCTION PROJECTS <br /> <br />Name From To Length Cost of Materials <br />-- -- <br />Swanson Street Bruce Street Smith Road 615 $ 1,415.77 <br />"A" Street Fourth Street Third Street 420 1, 047. 28 <br />Owens Street Greyson Street End of Houses 430 991. 96 <br /> <br />- 24 - <br />