My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 08/22/1967
City-of-Martinsville
>
City Council
>
Minutes
>
1967
>
Minutes 08/22/1967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2007 3:31:18 PM
Creation date
1/9/2007 3:05:09 PM
Metadata
Fields
Template:
City Council
Meeting Date
8/22/1967
City Council - Category
Minutes
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />20(~ <br /> <br />TUESDAY <br /> <br />AUGUST 22, 1967 <br /> <br />In response to inquiry of City Manager Noland pertaining to a feasibility <br /> <br />study proposal submitted by a consultant specializing in data processing <br /> <br />systems (fee of $1,500.00), i. e., as to whether the City should convert <br /> <br />to such a system either by ownership or leasing of equipment or by <br /> <br />"farming" its work out to a processing center, Council asked that City <br /> <br />Manager Noland ascertain from other cities, the size of Martinsville, as <br /> <br />to their present and/or proposed systems and their conclusions thereon. <br /> <br />Meanwhile, a representative (present) from one of the manufacturers of such <br /> <br />equipment indicated that the equipment manufacturers could perform the <br /> <br />same services and studies as would be performed by an independent consultant, <br /> <br />but without cost to the City. <br /> <br />Council, in reviewing the following bids recently received, Council accepted <br /> <br />the lowest total bid received (viz., that of Prillaman & Pace) and awarded <br /> <br />contract in accordance therewith: <br /> <br />Bidders <br /> <br /> Storm Sanitary <br /> Sewers Sewers <br /> (a) (b) <br />$ 16,185.00 $ 9,918.50 <br /> 11,299.00 14,804.94 <br /> 9,459.23 10,035.79 <br /> <br />$ 26,103.50 <br />26,103.94 <br />19,495.02 <br /> <br />Total <br /> <br />Bryant's Plumbing & Heating <br />Hackler-Seymour Metal Works <br />Prillaman & Pace, Inc. <br />(a) 396' of 15" pipe ) <br /> 361 of 18" pipe ) <br /> 327' of 24" pipe ) <br /> 41 r of 3.J" pipe ) <br />(b) 1495' of 8" VC pipe <br /> 72' of 4" laterals <br /> <br />for new City Hall project <br /> <br />for Fisher Road, near C&NW Freight Station, <br />and for properties on Second Street <br /> <br />Council acknowledged receipt of a curb-and-gutter petition submitted for a <br /> <br />portion of Graves Street, which petition lacked one required signature. <br />
The URL can be used to link to this page
Your browser does not support the video tag.