My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 08/12/1980
City-of-Martinsville
>
City Council
>
Minutes
>
1980
>
Minutes 08/12/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2006 1:23:24 PM
Creation date
12/6/2006 11:49:21 AM
Metadata
Fields
Template:
City Council
Meeting Date
8/12/1980
City Council - Category
Minutes
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />This prediction of cash-flow deficits in the early years of the project has had, <br />as will be seen, a continued dampcnin g effect on the project; and the Select <br />Committee has played some additional and important roles in the life of the <br />whole proposition. <br /> <br />City Council Involvement, Early 1979 <br /> <br />Faced with the Select Committee's contradictions of the Beck Appraisal Report <br />and the prospect of an additional sizeable expense if it decided to proceed <br />with Phase 11 of the project, City Council undertook, as individuals, study of <br />various aspects of the proposition in February-March, 1979. <br /> <br />Then-councilman, now-mayor Barry Greene took on the task of analyzing again <br />the questions of financial feasibility. More exactly, he developed various <br />approaches to handling the possibility of $3- 5,000,000 in short-term deficits. <br />With the informal advice of investment experts, he suggested (1) the setting <br />aside of certain Electric Department surplus funds to draw against; and (2) <br />the possibility of some innovative financing approaches (including the llramped <br />capitalized interest:! concept). His conclusion, again based on certain assumptions <br />as to the four feasibility factors previously mentioned, was that the potential <br />deficits could be handled. <br /> <br />Other members of Council reported positively on various other aspects of <br />the project, and it was agreed in March, 1979, to proceed with Phase II. <br /> <br />On April 10, 1979, the Council authorized the first of two installments to <br />the escrow fund, recommended earlier by Councilman Greene, in the amount <br />of $900,000. The second installment, of $300,000, was then authorized <br />September 11, 1979. With accrued interest, this account is estimated to <br />amount to $1,343,466 at June 30, 1980. <br /> <br />Re-Enter Beck <br /> <br />The City had circulated a llrequest for proposals" (RFP) in August, 1978, <br />to a number of consulting engineering firms (including R. W. Beck and <br />Associates) to determine the costs of proceeding with the Phase II and Phase III <br />(yet to be discussed in this report) portions of the project. Beck was then <br />chosen by Council to continue as the chief engineering consultant for the project. <br /> <br />Phase II was referred to originally as a single proposition aJ1d called the <br />"Evaluation Studyll. Upon negotiation with Beck, however, it was agreed <br />that Phase II would be divided into two parts, A and B. A contract with <br />Beck, in the amount of $130,000, was subsequently signed to proceed with <br />what was now titled the "Phase II-A - Interim Evaluation Report", to include <br />the following: <br /> <br />a. Aerial photography, mapping and survey work <br /> <br />b. Geological and subsurface investigations <br /> <br />c. Updating of projected construction costs <br /> <br />d. Re-analysis of the project's economic feasibility. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.