Laserfiche WebLink
<br />"II.. <br />'.>. () <br /> <br />TUESDAY <br /> <br />APRIL 14, 1981 <br /> <br />(11) Social Services. The two budget accounts submitted by the Social <br />Services Board were reviewed in detail by my office, but unchanged. <br />(12) Education. The various accounts submitted by the School Board were <br />reviewed in detail by my office, but unchanged. <br />(13) Constitutional Officers - Treasurer. The Treasurer has submitted a <br />request to the Compensation Board for an additional clerk. The outcome <br />of this request is unknown and the additional position is not reflected <br />in the budget. <br />(14) Constitutional Officers - Sheriff. The Sheriff has submitted a request <br />to the Compensation Board for an additional deputy in the Jail. The <br />outcome of this request is also unknown, but the additional position is <br />reflected in the budget. <br />(15) Constitutional Officers - Clerk of Circuit Court. The Clerk is proposing <br />that the local supplement to his salary be increased from $3,600 annually <br />to $5,600, the first such increase since 1974. <br />(16) Regional Library. The total contribution to the Regional Library, $143,966, <br />is proposed to be paid from Revenue Sharing funds. <br /> <br />Electric Fund <br /> <br />(1) Generation. This account is up 38.2% over the current budget, reflecting <br />the sizeable increase in our purchased power cost. In addition, $35,000 is <br />budgeted for substantive repair to erosion on the top part of our hydroelectric <br />dam--work which has already been delayed too long. <br />(2) Construction. This account is substantially higher than the current budget, <br />by $194,898 or 51%. This is primarily due, however, to including $180,000 to <br />pay R. W. Beck for engineering work on Phase III-A of the Ridgeway Hydro project. <br />(3) Transfers/Other Funds. This account is reduced by $96,266 from the current <br />budget, reflecting: <br />(a) A reduction of $16,266 in the transfer to the General Fund. <br />(b) A reduction of $100,000 in the amount previously viewed as an allowance <br />for depreciation. However, it is proposed that the $100,000 budgeted <br />actually be "expended" or transferred to a specific reserve for depreciation. <br /> <br />Water Fund <br /> <br />The total of all Water Fund expenditures is increasing by only $42,670, or 5.7% over <br />the current budget. There is no budgetary provlslon, however, for the City's share <br />of the UDAG project, which amount will have to be specially appropriated from the Water <br />Fund surplus during the coming year when the project is completed and final overall <br />costs are determined. <br /> <br />Sewer Fund <br /> <br />No provision is made in the proposed budget to cover the City's share of the "interim <br />improvements" to the wastewater treatment plant. Design work is proceeding and at a <br />point during FY81-82, when contract costs are determined, special appropriation will <br />have to be made from the Sewer Fund surplus to fund these improvements. <br />(1) Wastewater Plant. It will cost $305,984 more to operate our wastewater plant <br />next year than is currently budgeted. However, the current budget is badly <br />understated and it is more meaningful to see that the FY81-82 proposed budget <br />is 26.5% greater that the projected estimate of cost for this year. This is <br />so, in part, because: <br />