Laserfiche WebLink
<br />3. The reactive demand in KV AR shall be taken each month as the highest single 30-minute integrated <br />peak in KV AR as registered during the month by a demand meter. <br /> <br />4. The rate set forth in this Schedule is based upon the delivery and measurement of energy at <br />standard voltages established by the City of not less than 2.4 KV or more than approximately 40 KV. <br />Where service is delivered from lines operated at a normal voltage of approximately 40 KV or less, <br />service hereunder shall be delivered and measured at the primary voltage of the said line. <br /> <br />5. Where the customer owns, operates and maintains all equipment and apparatus beyond the delivery <br />point of service which are necessary for receiving and purchasing electric energy at the primary <br />voltage oflines operating at 34,500 volts or over, bills hereunder shall be subject to a credit of$0.53 <br />per KW of monthly billing demand. When the measurement of energy is at the secondary side of <br />transformers owned by the customer with primary voltage at 34,500 volts or over, multiply actual <br />KW used by 1.04. <br /> <br />9 <br />