My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 06/28/2005
City-of-Martinsville
>
City Council
>
Agendas
>
2005
>
Agenda 06/28/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2005 3:52:41 PM
Creation date
9/29/2005 2:50:15 PM
Metadata
Fields
Template:
City Council
Meeting Date
6/28/2005
City Council - Category
Agendas
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />For 60 Amp Single Phase Entrance $6.00 <br />For 60 Amp Three Phase Entrance $8.00 <br /> <br />For 100 Amp Single Phase Entrance $10.00 <br /> <br />For 100 Amp Three Phase Entrance $15.00 <br /> <br />For 200 Amp Single Phase Entrance $20.00 <br /> <br />For 200 Amp Three Phase Entrance $25.00 <br /> <br />For 400 Amp Single Phase Entrance $40.00 <br /> <br />For 400 Amp Three Phase Entrance $50.00 <br /> <br />For 600 Amp Single Phase Entrance $75.00 <br /> <br />All over 600 Amps $125.00 <br /> <br />Change from 2 wires to 3 wire for Range or Water Heater $3.00 <br /> <br />For rewiring, where service is changed, the inspection fee will be a minimum charge of <br />$40.00 plus the fee charged for a new service installation. <br /> <br />For rewiring or additional wiring, where the service is unchanged, a minimum inspection fee <br />of $40.00 will be charged, plus $1.00 per KV A capacity of branch circuits replaced or added. <br />KV A capacity of heating and lighting circuits will be determined by using the nearest 100 <br />volts as the multiple. Power circuits will be rated at one KV A per horsepower. <br /> <br />For miscellaneous sign lighting, neon, neon outline, incandescent, etc., a minimum inspection <br />fee of $40.00 shall be charged. For large quantities, fees shall be based on the schedule above. <br /> <br />D. Mechanical Code-Heating, Air Conditioning, etc. <br /> <br />I. For issuing each permit $40.00 <br /> <br />In addition: <br />For installation of new systems for heating and ventilating, air conditioning and refrigeration <br />costing up to $5000 - $10.00 plus $2.00 for each additional $1000 of cost or fraction thereof. <br /> <br />For repair, alterations and additions to an existing system - $2.00 - for each $1000 of cost or <br />fraction thereof. <br /> <br />For boilers: 33,000 BHP to 165,000 BHP $5.00,165,000 BHP to 330,000 BHP $10.00, <br />330,000 BHP to 1,165,000 BHP $15.00,1,165,000 BHP 3,300,000 BHP $25.00, Over <br />3,300,000 BHP $35.00 <br /> <br />2. For inspecting a heating, ventilating, refrigeration or air conditioning system to provide for <br />temporary operation and testing $5.00 (change to $40.00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.