Laserfiche WebLink
TOTAL: <br /> <br /> RECYC LING <br />MARKET STREET LOCATION <br /> <br />FEBRUARY, MARCH, APRIL '04 <br /> <br />Materials Collected: <br /> <br />I. Aluminum 388 <br />2. Bi-metal Cans 1,235 <br />3. Newspaper 33,700 <br />4. Plastic 3,920 <br />5. Glass 8,740 <br /> <br />TOTAL: 47,983 <br /> (23.99 Tons) <br /> <br />Total Cost of Drop-off Site Operation <br /> <br />Rental of Containers: <br /> a. February <br /> b. March <br /> c. April <br /> <br />=$240.00 <br />=$240.00 <br />=$240.00 <br />$720.00 <br /> <br />Haul/Transport Fee: <br /> a. February <br /> b. March <br /> c. April <br /> <br />=$546.20 <br />=$546.20 <br />=$634.45 <br />$1726.85 <br /> <br />TOTAL: $2,446.85 <br /> <br />3. Value of Materials Collected: <br /> a. Aluminum Cans = ($116.40) <br /> b. Bi-metal = 0 <br /> c. Newspaper = 0 <br /> d. Plastic = 0 <br /> e. Glass = 0 <br /> <br />TOTAL: ($116.40) <br /> <br /> $2,330.45 <br />(COST/TON = $97.14) <br /> <br /> <br />