My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 05/25/2004
City-of-Martinsville
>
City Council
>
Agendas
>
2004
>
Agenda 05/25/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2004 4:37:39 PM
Creation date
6/17/2004 4:22:14 PM
Metadata
Fields
Template:
City Council
Meeting Date
5/25/2004
City Council - Category
Agendas
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The reactive demand in KVAR shall be taken each month as the highest single 30-minute integrated <br />peak in KVAR as registered during the month by a demand meter. <br /> <br />The rate set forth in this Schedule is based upon the delivery and measurement of energy at standard <br />voltages established by the City of not less than 2.4 KV or more than approximately 40 KV. Where <br />service is delivered from lines operated at a normal voltage of approximately 40 KV or less, service <br />hereunder shall be delivered and measured at the primary voltage of the said line. <br /> <br />5. Where the customer owns, operates and maintains all equipment and apparatus beyond the delivery <br /> point of service which are necessary for receiving and purchasing electric energy at the primary <br /> voltage of lines operating at 34,500 volts or over, bills hereunder shall be subject to a credit of $0.53 <br /> per KW of monthly billing demand. When the measurement of energy is at the secondary side of <br /> transformers owned by the customer with primary voltage at 34,500 volts or over, multiply actual KW <br /> used by 1.04. <br /> <br />A-9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.