My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 03/27/1990
City-of-Martinsville
>
City Council
>
Minutes
>
1990
>
Minutes 03/27/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2000 10:00:29 PM
Creation date
6/15/1999 8:08:57 PM
Metadata
Fields
Template:
City Council
Meeting Date
3/27/1990
City Council - Category
Minutes
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE E-4: ALTERNATIVE COMPARISON <br /> <br />Alternative <br /> <br />Cost <br />Per Ton <br /> <br /> Landfill <br />Deferred Cost <br /> <br />1. Source separation <br /> recycling (11.5%) <br /> and landfilling. <br /> <br />Landfill <br />Life Impact <br /> <br />Source separation <br />recycling (11.5%), <br />mass-burn with <br />steam production <br />and landfilling. <br /> <br />$35-$40 $.8-$1 1.3 <br /> <br />$50-$55 $2.2-$2.3 3.4 <br /> <br />3. Source separation <br /> recycling (11.5%), <br /> mass-burn with <br /> electricity pro- <br /> duction and <br /> landfilling. <br /> <br />$55-$60 $2.2-$2.3 3.4 <br /> <br />4. Post-collection <br /> separation <br /> recycling (16%), <br /> and landfilling. <br /> <br />$1.0-$1.1 1.7 <br /> <br />5. Post-collection <br /> separation re- <br /> cycling (16%), <br /> mass-burn of steam <br /> production and <br /> landfilling. <br /> <br />$65-$70 $2.6-$2.7 5.7 <br /> <br />6. Post-collection <br /> separation re- <br /> cycling (16%), <br /> mass-burn with <br /> electricity <br /> production and <br /> landfilling. <br /> <br />$70-$75 $2.6-$2.7 5.7 <br /> <br />7. Post-collection <br /> separation re- <br /> cycling.(16%), <br /> fluidized-bed <br /> with steam pro- <br /> duction and <br /> landfilling. <br /> <br />$40-$45 $2.6-$2.7 5.7 <br /> <br />NOTES: (1) <br /> (2) <br /> <br />1990 dollars, 1995 quantities. <br />Based on disposal cost of $31 per ton <br />(not including collection), Martinsville North <br />joint disposal site. <br /> <br />13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.