Laserfiche WebLink
THURSDAY, APRIL 23, 1998 <br /> <br /> terrazzo floors, the merits of plumbing in every classroom, the number and placement of elevators, the joining <br /> <br />of the East and West ends of the second floor by a new connecting stair, and the location of a chair lii~ on this <br />new connecting stair. In addition, the creation of new classrooms in the areas of the old cafeteria, the addition <br />of a media room in the old gymnasium, the preservation of the radius windows in the media room, and the <br />energy savings anticipated from new glazing in this area were also discussed. Mr. Dallas commented on the <br />fact that handicapped students would not be able to readily access the new classrooms in the lower level of the <br />old cafeteria, and was told that even more classrooms would be handicap accessible on the main floor, and <br />that the lower level rooms would be accessible through the outside entrance. It was also made clear that any <br />programs, teachers, or equipment provided on lower floors could easily be moved and/or replicated on the <br />upper floors. Council Member Dallas once again stated that he found such design compromises unacceptable <br />in a school project that was supposed to become the best facility in the school system. Dr. Trollinger <br />emphasized that the current design provided for an abundance of third grade classrooms accessible to <br />handicapped students, with outstand!ng program space accessible to every grade level and student, with <br /> -.~ <br /> <br />eleven to twelve classrooms per grade level available. Cost and schedule issues were next discussed. Mr. <br /> <br />Smith stated that cost estimates were to be completed within a week, with a simultaneous independent cost <br />estimate being performed within two weeks thereafter. Development Specialist David Reeves stated that <br />these estimates would be made against design development documents, representing a 35% completion level <br />relative to actual bid documents. Mr. Smith stated that no add or delete alternates would be created until the <br />estimates on the entire project as discussed came in, and that the overall budget for the project at this time <br />was estimated $9.1 million, with $7.5 to $7.7 million for actual construction. Council Member Teague asked <br />at what point final commitment was made to design elements and costs, and was told that this occurs wh6n~,~n <br />actual bid on the project is accepted. Mr. Teagne then asked if the new school construction funds being <br />proposed by the General Assembly were to be continuing funds, and Dr. Trollinger stated that there was only <br />a two year commitment of such funds being considered at this time. Council Member Haskell then asked <br />what items beyond actual construction costs were included in the $9.1 million figure, and was told this <br /> <br /> <br />