Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />City of Martinsville <br />Capital Improvement Plan FY 2007 <br /> <br />Revised: <br /> <br />Department <br /> <br />ITEMS REMAINING <br /> <br />APPROVED <br /> <br />RECOMMENDED <br /> <br />RECOMMENDED <br /> <br />SAVINGS <br /> <br /> OR PURCHASED WITH SAVINGS BUDGET FOR PURCHASE FOR HOLD <br /> 2Ton Dump Truck $54,000 ($278) <br /> Pool Cars (2) $25,000 ($3,690) <br /> City Hall Bldg Security $60,000 $60,000 <br /> Fiber Optic $20,000 $20,000 <br /> MINET $20,000 $20,000 <br /> sub total $339,000 $100,000 $31,000 $40,557 <br />REFUSE <br /> Close Landfill (DEQ Requirement) $2,300,000 $2,300,000 <br /> Land Fill Corrective Action Plan $75,000 $75,000 <br /> Rear Loader Garbage Truck $93,944 $93,944 <br /> sub total $2;'468,944 $2,468,944 <br />Water Fund <br /> Turbidimeters (5) $10,600 ($788) <br /> Cover Water Basin $45,000 $45,000 <br /> SUV - Water Maint $26,000 $5,562 <br /> Flat Bed Truck Water Const. $38,000 $1 ,132 <br /> Transmitters $3,500 $288 <br /> Hospital Fire Line $50,000 $50,000 <br /> Replace Finish pump #2 $50,000 $6,000 <br /> Hydrant Replacement & Extension $36,000 $36,000 <br /> Construct Water Main (Church St. Ext) $15,000 $10,000 <br /> Grout Spillway- reappropriated $10,000 $10,000 <br /> Emergency repair of generator - reappropriated $17,000 <br /> Water line - Barrows Mills Project - reappropriated $11,310 $177 <br /> sub total $312,410 $141,000 $22,371 <br />Sewer Fund <br /> Replace Roof Air Conditioning Unit $15,000 $8,017 <br /> 3/4 T Pick Up @ WWTP $26,000 $41 <br /> Contract Services Inflow Reduction $25,000 $10,000 <br /> I sub total $66,000 $18,058 <br />Electric <br /> Generators at Hydro $200,000 $88,625 <br /> Replace Intake Grates at Hydro $27,000 $27,000 <br /> Independence Underground Line 7200 Volt $50,000 $50,000 <br /> 34.5 KV Sub Station Circuit Breaker $45,000 $45,000 <br /> 15 KV Circuit Breaker $35,000 $35,000 <br /> Digger Derrick Truck $200,000 $200,000 <br /> Cost to serve new developments $40,000 $40,000 <br /> Replace SCADA $60,000 $60,000 <br /> Single Bucket Truck, rehose $10,000 $10,000 <br /> Plug-In test meter $7,000 $7,000 <br /> UpTown Street lights $46,000 $46,000 <br /> 12KV & 34 KV Breakers - reappropriated $61,338 $1,140 <br /> 3 year Maintenance Contract - reappropriated $39,000 $500 <br /> Emerg. replacement of regulators - reappropriated $36,000 $36,000 <br /> Rail Trail Lights - reappropriated $50,000 $50,000 <br /> sub total $906,338 $503,000 $103,000 $90,265 <br /> <br />..... <br /> <br />GRAND TOTAL <br /> <br />$4,409,101 <br /> <br />$3,408,844 <br /> <br />$188.900 <br /> <br />$201.392 <br /> <br />TOTAL RECOMMENDED FOR HOLD/SAVINGS <br /> <br />$390,292 <br /> <br />Page 2 <br />