My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 08/08/1977
City-of-Martinsville
>
City Council
>
Minutes
>
1977
>
Minutes 08/08/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2006 11:45:16 AM
Creation date
12/12/2006 10:45:05 AM
Metadata
Fields
Template:
City Council
Meeting Date
8/8/1977
City Council - Category
Minutes
City Council - Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />430 <br /> <br />AUGUST 8 ~ 1977 <br /> <br />MONDAY <br /> <br />A special and duly-called meeting of the Council of the City of Martinsville, Virginia, <br /> <br />was held Monday, August 8, 1977, in the Council Chamber, City Hall, beginning at 7:30 <br /> <br />P.M., all members being present, viz., William D. Hobson, Mayor; William C. Cole, Jr., <br /> <br />Vice Mayor; Barry A. Greene; L. D. Oakes; and Francis T. West. <br /> <br />The purpose of this meeting was to consider--and possibly take action on--an engineering <br /> <br />report entitled, "Potential Hydroelectric Developments - Report on Site Selection Survey - <br /> <br />City of Martinsville, Virginia", as prepared and presented by R. W. Beck & Associates, <br /> <br />Engineers and Consultants, of Seattle, Washington. Representing this firm were <br /> <br />Mr. Richard H. McLemore, Executive Engineer, of the Seattle office; Mr. Robert G. Taylor, <br /> <br />of the Wellesley (Massachusetts) office; and Mr. R. C. Anders, Special Consultant, of <br /> <br />Bedford, Virginia. The following is an outline of said Site Selection Survey Report, <br /> <br />consisting of eleven sections~ of which Section I (Introduction), Tables 3 and 6 of <br /> <br />Section VIII, and Section XI (Conclusions and Recommendations) are hereinafter made a <br /> <br />part of these minutes: <br /> <br />Section <br />Number <br /> <br />Section and Subsection Title <br /> <br />Letter of Transmittal <br />Certificate of Engineer <br />Outline of Report <br />List of Tables <br />List of Figures <br /> <br />I <br /> <br />INTRODUCTION <br /> <br />1. Authorization <br />2. Scope of Work <br />3. Existing Power Supply <br />a. Existing Hydroelectric Plant <br />b. Purchased Power <br />c. Power Definitions Used in Report <br /> <br />II <br /> <br />CRITERIA FOR HYDROELECTRIC SITES <br /> <br />1. Energy and Peaking Categories <br />2. Hydrology <br />3. Size of Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.