Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
<br />RECEIVED AUG 0 l~ 1381 <br /> <br />R. W. BECK AND ASSOCIATES <br /> <br />ENGINEERS AND CONSULTAr~TS <br /> <br />"NING <br />JIGN <br />RATES <br />ENVIRONMENTAL <br />ECONOMICS <br />MANAGEMENT <br /> <br />TOWER BUILDING <br /> <br />7TH AVENUE AT OLIVE WAY <br /> <br />SEATTLE, WASHINGTON 96101 <br /> <br />206.622.5000 <br /> <br />GENERAL OFFICE <br />SEATTLE, WASHINGTOt~ <br />206.622-5000 <br /> <br />FILENO. MW-6238-HPl-MD August 1, 1980 <br />3001 <br /> <br />Mr. Don R. Edmonds, City Manager <br />City of Martinsville <br />P. O. Box ll12 <br />Martinsville, Virginia 24112 <br /> <br />Dear Don: <br /> <br />Subject: Ridgeway Hydroelectric Project <br />Proposal for Engineering Services <br />Phase IlIA - Preparation of FERC <br />License Application <br /> <br />Following our discussions on July 29, 1980, we have updated our <br />proposal for the engineering cost estimate and schedule of completion for the <br />Phase IlIA, Preparation of FERC License Application, for the Ridgeway Hydro- <br />electric Project, which was initially submitted with our letter of October 9, <br />1979. Based on this update, we herewith submit a new proposal for these <br />services. Also as requested, we have prepared a separate letter describing <br />the future Phase IIIB work, and other activities in calendar year 1982, with <br />an estimate of costs of doing such work. <br /> <br />The Phase IlIA studies consist of preparation of the 20 required <br />FERC License Application exhibits, coordination of work items, meetings with <br />Federal, state and local agencies and review of exhibits with the Federal <br />Energy Regulatory Commi.ssion (FERC) and the City of Martinsvi1le. We estimate <br />the preparation of FERC License Application will take about 16 months to <br />complete, ready for initial submittal to FERC, and have based the proposal on <br />the work commencing on September 1, 1980. Our enclosed Work Order \~~-6238- <br />HPl-MF is for the Phase IlIA work. <br /> <br />The detailed scope of services to be performed under this Work Order <br />is described in Exhibit A, and the schedule and estimated cost of performing <br />these services is shown in Exhibit B. We estimate the cost of providing these <br />Phase IlIA services at about $340,000, and billings would not exceed this <br />amount without prior authorization by the City. The estimated funding require- <br />ments on a quarterly basis are also shown in Exhibit B. <br /> <br />Seattle, WA . Denver, CO . Phoeni).:, AZ . Orlando. fl . Columbus, NE . WeHesley, MA . Indianapolis, IN . Minneapolis, MN . Nashvil!p, TN . Sacramento. c.A. <br />