My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 01/24/1984
City-of-Martinsville
>
City Council
>
Minutes
>
1984
>
Minutes 01/24/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2006 2:35:45 PM
Creation date
11/16/2006 10:12:30 AM
Metadata
Fields
Template:
City Council
Meeting Date
1/24/1984
City Council - Category
Minutes
City Council - Type
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2.. ~ <br />L <br /> <br />TUESDAY <br /> <br />JANUARY 24, 1984 <br /> <br />---- <br /> <br />The Regulatory Agencies <br /> <br />Perhaps not enough has been said in recent months about the folks <br />who have the trump cards in all this. There are three state agencies <br />with varying degrees of control over what we do or don't do with <br />our plant--the Health Department, the Water Control Board and the Air <br />Pollution Control Board. <br /> <br />During the past four years since all this began, these agencies <br />have been monitoring our progress and reviewtng all our plans and <br />counter-plans. They have been largely cooperative and patient. <br />But they have extracted from us a variety of commitments and we are <br />behind in honoring some of those commitments. <br /> <br />One result of our lack of progress in expanding our plant is that <br />we are now somewhat routinely exceeding the permitted capacity. In <br />September, our flow averaged 6.14 MGD; in October, it averaged <br />6.30 MGD; and in November it was 5.80 MGD--for a three-month average <br />in excess of 6.0 MGD. We are, therefore, vulnerable to sanctions or <br />penalties, including the possibility of having a moratorium declared <br />on new connections. <br /> <br />The point is that we cannot reasonably expect these regulatory <br />agencies to sit still indefinitely while we try to convince P.S.A. <br />what's good for them or while we chase after a succession of new <br />plans proposed by interested citizens. <br /> <br />Conclusions and <br />Recommendations <br /> <br />On November 15 the consultants advised you to authorize them to <br />proceed with improvements to the existing plant and expansion of <br />its overall capacity to 8.0 MGD. <br /> <br />Wiley & Wilson then revised its recommendation to the Council as <br />to an immediate course of action and on January 10 the engineers <br />recommended that you authorize (a) preparation of detailed plans <br />and specifications on the proposed improvements to the existing <br />plant and (b) renewed negotiation to devise a mutually beneficial <br />financial arrangement with P.S.A. by which to "divert to Koehler <br />first". This change of posture by Wiley & Wilson can be <br />attributed to information and understandings coming from the <br />December 19 meeting of the three policy bodies--when it became <br />apparent that P.S.A. might never buy-in to an expansion of our <br />plant and that it might be possible for us to buy-in to the <br />Koehler plant on better terms than was originally considered. <br /> <br />In response, you have requested this overview and a concrete <br />recommendation on my part. The recommendation will follow a few <br />general and concluding observations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.