Laserfiche WebLink
<br />CITY OF MARTINSVILLE <br />SCHEDULE OF ELECTRIC SERVICE <br /> <br />Schedule: Small General Service (S.G.S.) <br /> <br />07/01/06 <br /> <br />EFFECTIVE DATES: <br />City of Martinsville: <br /> <br />Availability of Service <br /> <br />Available for small general service customers with normal maximum electrical capacity <br />requirements of 25 KW or less per month. <br /> <br />When a customer being served under this Schedule establishes or exceeds a normal maximum <br />requirement of 25 KW per month for more than two months during the past twelve months, the <br />customer will be placed on the appropriate rate Schedule. <br /> <br />Monthly Rate <br /> <br />$15.00 <br />Customer Charge-------------------________________________ $13.64 per Month <br /> <br />Energy Charge .05664 <br />All Metered KWH-------------------___________________ .05149 per KWH <br /> <br />Levelized Fuel Factor .02498 <br />All metered KWH------------------___________________ .02271 per KWH <br /> <br />Minimum Charge <br /> <br />This Schedule is subject to a minimum monthly charge equal to the Customer Charge, <br />plus such additional charges as are derived from application of the Demand Charge and Energy <br />Charge. <br /> <br />Special Terms and Conditions <br /> <br />1. Service under this Schedule will normally be delivered through not more than one single <br />phase or polyphase demand meter, and the customer's demand will be taken monthly to <br />be the highest registration for a 15-minute period on that meter. <br /> <br />2. Where a customer has more than one building or facility on the same site or where a <br />single building is allowed more than one service, the monthly billing demand will be <br /> <br />4 <br />