My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 06/13/2005
City-of-Martinsville
>
City Council
>
Minutes
>
2005
>
Minutes 06/13/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2006 9:59:33 AM
Creation date
2/2/2006 9:34:16 AM
Metadata
Fields
Template:
City Council
Meeting Date
6/13/2005
City Council - Category
Minutes
City Council - Type
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5. 'This Schedule shall be used to SC'fVicc certain residences whc:rc businesses 3Ie conducted therein ao; <br />defined in paragraph 4, page A-I - Schedulc: Residential (R.S.) - where the muimwn electrical <br />capacity of equipmenl for the portion of the re5idencc used for busiocss cxceed.s,2.5 KW when served by <br />. singlc meter. Ifthesc SCf'VlCCS are sepatalcd. this schedule shall ~ used to SCfVlce the business portion <br />of such residences <br /> <br />6. When the customer owns. operates. and nwntains the complete substation equipment, includmg any and <br />all tran.sform~ and/or swi1ches and/or other apparatus ncc:cssary for the customer to tale his en1ire <br />SCf'>;ce at the primary vollaSc of the transmission Of distribution line from which said customer is 10 <br />receive service. J credit of SO.32 per KW of monthly billingdcmand will be applied 10 each monthly <br />bill. <br /> <br />7 llus Schedule shall be used for all temporary servIce installations. <br /> <br />4 For the purpose of thIS Schedule. comme-;cial operJllOnS are conSIdered 10 include hotels. motels lI1d <br />boarding houses with more than five hoarders <br /> <br />This Schedule shaH be used 10 sef\'ice cmain reSidences where businesses arc condw...1ed theretn as <br />defined in paragraph .$. page A-I - Schedule: Residential (R.$,) - "",-here the maximwn electrical <br />capacilY of equipment for the portion of Ihe residence used for business exceeds :U K W when served b!, <br />a single meter. If these services are separaled. Ihls schcdule shall be used 10 service lhe business portion <br />of such residences <br /> <br />6. When the cus10mer owns, opuatcs. and maintains the complete substation equipment, including any and <br />all transformers and/or switches and/or other appararus necessary for thc customer to take his enlire <br />service at the pnmary voltage of the transmisSlOn or distribution line from which said cuslomer is 10 <br />receive service. a credil of SO.32 per K W of monlhly billing demand will be applied to each monthly <br />bill. <br /> <br />7 This Schedule shall be used for all temporary servIce installations. <br /> <br />CITY OF MARTrNS VILLE <br />SCHEDULE OF ELECTRIC SERVICE <br /> <br />Schedule: Medium Genera.! ServIce (M.G.S_) <br /> <br />EFFECTIVE DATES: <br />City of Mar1insville: 07tO!t(J5 <br /> <br />AvailabililV of Service <br /> <br />Available for medium geocnJ scrvu.::e c.uslomer. industrial and ~mmcrc1aJ operations. apartmenl houses.with a <br />single meter. and residences where busmesses are conducted With I single metCT. and where nonnal maximum <br />electrical capacilY requirements are less than lOOK W per month bUI more than 25 KW. Customers whose <br />oonnaJ service requirements exceed lOOK W pel" month, but are less than 3()() K W per month may be placed on <br />Ihe schedule if It is determined it will be less cosily 10 the CUSlorncr. <br /> <br />When a customer being served under this Schedule csubhshes or exceeds a nonnal. maximum requirement of <br />300 KW per month, the customer will be placed on the appropnate rate Schedule and required 10 contract for <br />such capacity requirements. <br /> <br />Monthlv Rate <br /> <br />Under 1000 Volts <br /> <br />Over 1000 Volts <br /> <br />C ustorner Charge------------ $ 12. 87 per Month <br /> <br />118.02 per Month <br /> <br />All KW of Billing Demandn..nnnn~_~ $4,88 per KW <br /> <br />IU8 per K W <br /> <br />Energy Charge <br />All Me1ered KWH----------------------OJ9Il per KWH <br /> <br />OJRI9 per KWH <br /> <br />Levehzed Fuel Factor <br />All metered KWH_mmnm u___un .02271 per K\),,:H <br /> <br />02~71 per KWH <br /> <br />Minimum Charge <br /> <br />This Schedule IS subJecl 10 a minimum monthly charge equ,aJ to the CUSlomer Charge. plus such <br />additional charges as are denved from application of the Demand Charge and Energy Charge. <br /> <br />Special Terms and ConditiOns <br /> <br />I. Service: under this Schedule will normally be delivered through not more Ihan one ., one <br />polyphase demand mder, and the customer's demand ......,1I be laken monthly to be the highest <br />regislration for a 15-minute penod on that meter. <br /> <br />2. Where a customer has more than one building or facilllY on the samO;' site or where a single building is <br />allowed more than one service. the monthly billing demand will be taken as lhe sum of alllhe separale <br />meters lO....olved <br /> <br />-l. This Schedule: shall be used to serve apartment houses ...;;here the indll:lduaJ UOItS;1I <br />melered, An apartment shall be defined as a bUilding or ponion lhcrL'Of used or de:'l, <br />tor two or more familIes li\"ing tndependent of each othe:-_ Families shall be considered to be IIVlilt! <br />independently of ea..:h olher where their respeclive units have separatc ingress and kitcher. facilities. <br /> <br />CITY OF "IARTINSVILLE <br />SCHEDULE OF ELECTRIC SERVICE <br /> <br />S..:hedule Luec: General Ser,i("c (LG,S) <br /> <br />EFFECTIVE DATES <br />City of Maninsville 07101 '05 <br /> <br />Availabilitv ofSc:rv1ce <br /> <br />Available for larg~ business. industrial and commercial operations whose normal service requirements exceeds <br />300 KW. Custom<:n whose nonnal service requiremenls exceed 100 KW per monlh. bUI are less lhan 300 KW <br />per month may be placed on !he schedule ifit IS detennined il will be less costly to the customer. <br />DELIVERY VOLT AGE <br />Monthlv Rate 120 10 1000 Volts Over 1000 Volts <br /> <br />Customer Charge-____________m_____ S45.05 per Month <br /> <br />592.24 per ~onth <br /> <br />Demand Charge <br />All KW of Billing Demand--------------- $12.52 per KW <br /> <br />$11.61 per KW <br /> <br />Reactive Demand Charges <br />All KV AR ofugging Reactive Demand--- OA2 per KV AR <br /> <br />042 per KVAR <br /> <br />Energy Charge <br />All Me1ered KWH------------------- .OOR83 per KWH <br /> <br />.00862 per KWH <br /> <br />Levehzcd Fuel Factor <br />All metered KWH-------------- .02~71 per KWH <br /> <br />02271 per KWH <br /> <br />(Bi11iog shall be rounded 10 the nearest whole KW and KVAR.) <br />Minimum 0\ar2C <br /> <br />"The minimum chIrJe for a customer under this Schedule will ~ 60 ./. of his contract capacity, bUI in no event <br />shalllhis charJe be toe less than lOOK W. <br /> <br />Snecial Terms mil Conditions <br /> <br />I. Customers under this Schedule shall be required to contract for a definl(e amount of electrical capacity <br />in kilowans., sufficient to meelllOrmaJ maximum requirements. In no ca.sc: shall the capaci1Y contraCted <br />for be less than 100 KW. and the City may not be required 10 supply capacity in eXcess of thai <br />contracted for except by mutual consenl. Contract capacities shall be in multiples of25 KW. <br /> <br />2. Service under this Schedule will normally be delivered through not morc: than one single phase or one <br />polyphase demand meter, and the cus10mer's demand will be taken monthJy to be Ihe highest <br />registralton for a 15-minute period on that meter. <br /> <br />3. "The re8Ctive demand in KVAR sha)1 be taken each month as the highest single 15-minule inlegrated <br />peak in K V AR as registered during the month by a demand meter <br /> <br />4. Where a c:uscomer tw more than one building or facility on the same sile or where a single buildina is <br />allowed I'1'tOfC chan one service. the monlhly billing demand will be taken IS the swn of all the sepanle <br />meters involval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.