Laserfiche WebLink
CITY OF MARTINSVILLE <br />SCHEDULE OF ELECTRIC SERVICE <br /> <br />Schedule: Large General Service (L.G.S.) <br /> <br />EFFECTIVE DATES: <br />City of Martinsville: 07101/05 <br /> <br />Availability of Service <br /> <br />Available for large business, industrial and commercial operations whose normal service requirements exceeds <br />300 KW. Customers whose normal service requirements exceed 100 KW per month, but are less than 300 KW <br />per month may be placed on the schedule if it is determined it will be less costly to the customer. <br /> DELIVERY VOLTAGE <br />Monthly Rate 120 to I000 Volts Over 1000 Volts <br /> <br />Customer Charge .......................... $45.05 per Month $92.24 per Month <br /> <br />Demand Charge <br /> All KW of Billing Demand ............... $12.52 per KW <br /> <br />$11.61 perKW <br /> <br />Reactive Demand Charges <br /> All KVAR of Lagging Reactive Demand--- 0.42 per KVAR <br /> <br />0.42 per KVAR <br /> <br />Energy Charge <br /> All Metered KWH .................... .00883 per KWH <br /> <br />.00862 per KWH <br /> <br />Levelized Fuel Factor <br />All metered KWH .................. .02271 per KWH <br /> <br />.02271 per KWH <br /> <br />{'Billing shall be rounded to the nearest whole KW and KVAR.) <br />Minimum Charge <br /> <br />The minimum charge for a customer under this Schedule will be 60 % of his contract capacity, but in no event <br />shall this charge be for less than 100 KW. <br /> <br />Special Terms and Conditions <br /> <br />Customers under this Schedule shall be iequired to contract for a definite amount of electrical capacity <br />in kilowatts, sufficient to meet normal maximum requirements. In no case shall the capacity contracted <br />for be less than 100 KW, and the City may not be required to supply capacity in excess of that <br />contracted for except by mutual consent. Contract capacities shall be in multiples of 25 KW. <br /> <br />Service under this Schedule will normally be delivered through not more than one single phase or one <br />polyphase demand meter, and the customer's demand will be taken monthly to be the highest <br />registration for a 15-minute period on that meter. <br /> <br />3. The reactive demand in KVAR shall be taken each month as the highest single 15-minute integrated <br /> peak in KVAR as registered during the month by a demand meter. <br /> <br />Where a customer has more than one building or facility on the same site or where a single building is <br />allowed more than one service, the monthly billing demand will be taken as the sum of all the separate <br />meters involved. <br /> <br /> <br />