Laserfiche WebLink
CITY OF MARTINSVII J <br />SCHEDULE OF ELECTRIC SERVICE <br /> <br />Schedule: Residential <br /> <br />EFFECTIVE DATES: <br />City of Martinsville: 07101/05 <br /> <br />Availability of Service <br /> <br />Available for full domestic electric service through one meter to individual residential customers. <br /> <br />Monthly Rate <br /> <br />Customer Charge .................................. $8.85 per Month <br /> <br />Energy Charge <br /> First 900 KWH ..................................... .05979 per KWH <br /> <br />All over 900 KWH ........................ .04.445 per KWH <br /> <br />Levelized Fuel Factor <br />All metered KWH .......................... .02271 per KWH <br /> <br />Minimum Charge <br /> <br />This Schedule is subject to a minimum monthly charge equal to the Customer Charge. <br /> <br />Special Terms and Conditions <br /> <br />This Schedule is available for single phase service only. However, at the City's option, and subject to the <br />City's Terms and Conditions of Service relating to the extension of service, three phase service may be <br />provided to individual residences under this Schedule, when all service on such Schedule is taken through <br />one meter and usage is for domestic purposes. Where three phase power service is required and/or where <br />motors or heating equipment are used for commercial or industrial purposes, the applicable power <br />Schedule will apply to such power service. <br /> <br />2. Customer may not take service to two or more separate residences through a single point of delivery, <br /> irrespective of common ownership of the several residences. <br /> <br />An owner of an apartment house shall have the choice of providing separate wiring for each apartment so <br />that the City may supply each apartment separately under this Schedule. Unless this separation of service <br />occurs, the apartment house shall be served under the Schedule for Small General Service. <br /> <br />A customer operating a business in his residence classified as a "Home Occupation" as defined in the <br />City's Zoning Ordinance and for which a business license is required by the Commissioner of Revenue <br />may take service under this schedule provided that the maximum electrical capacity of equipment for <br />portions of the residence used for business does not exceed 2.5 KW as determined by the Electric <br />Department. If the maximum electrical capacity of the equipment for the business portion of the residence <br />exceeds 2.5 KW, the entire residence shall be served and charges made under the schedule for small <br />general service (S.G.S.), unless the respective uses are metered separately; in such cases that portion of the <br />residence used for residential purposes may take service under this schedule. <br /> <br /> <br />