Laserfiche WebLink
RECYCLING <br /> <br />MARKET STREET LOCATION <br /> <br />FEBRUARY, MARCH, APRIL '03 <br /> <br />A. Materials Collected: <br /> <br />1. Aluminum <br />2. Bi-metal Cans <br />3. Newspaper <br />4. Plastic <br />5. Glass <br /> <br />454 lbs. <br />1,048 lbs. <br />28,900 lbs. <br />2,900 lbs. <br />7,460 lbs. <br /> <br />TOTAL: 40,762 <br /> (20.38 Tons) <br /> <br />B. Total Cost of Drop-off Site Operation: <br /> <br />Rental of Containers: <br />a. February <br />b. March <br />c. April <br /> <br />= $240.00 <br />= $240.00 <br />= $240.0O <br /> <br />$720.00 <br /> <br />2. Haul/Transport Fee: <br /> a. February <br /> b. March <br /> c. April <br /> <br />TOTAL: <br /> <br />= $273.40 <br />= $544.40 <br />= $612.45 <br /> $1,430.25 <br /> <br />$2,150.25 <br /> <br />B. Value of Materials Collected: 1. Aluminum Cans <br /> 2. Bi-Metal <br /> 3. Newspaper <br /> 4. Plastic <br /> 5. Glass <br /> <br />TOTAL: <br /> <br />= ($136.20) <br />=0 <br />=0 <br />=0 <br />=0 <br /> <br />($136.20) <br /> <br />TOTAL: <br /> <br /> $2,014.05 <br />(COST/TON = $98.82) <br /> <br /> <br />