Laserfiche WebLink
EXHIBIT "1" <br /> <br />Description of Materials and Area to be Covered <br /> <br /> Remodel at 107 West Church Street. Re-wire building and install new lighting <br />system. (See copy of KW Mech. bid) Install new plumbing for bathrooms and air lines. <br />Install new gas A/C system (see copy of A-I bid) Pour approximately 4" cement on upper <br />side. Install new drop ceiling in entire building and insulate. Install new insulated garage <br />door. Repair broken glass on upper side. Cut opening and install garage door 12' X 10' <br />insulated, on lower level, with new ramp. Build restrooms lower level using 6" block. <br />Offices to remain as is, except for new ceilings. Fill in pit and pour 4" cement over pit area. <br />Remove brick form lower side above windows and lay new brick. Install new security <br />system. Install bars over roof vents for security. Nothing to be done to floors in showroom, <br />offices, or bathrooms. All painting to be done by owner. <br /> <br /> <br />